As government regulation dictates more stringent effluent parameters for our wastewater treatment systems, and as corrosion and obsolescence demand the constant attention of plant operators, plant upgrades continue to be a focus of Blue Heron Construction.
Services include:
 Waste Water Purification Plant Construction
– Facility Construction
– Filtration system construction
– Fusion™ water storage tank installation
– Membrane/steel digester cover installation
– Wetland/biofilter construction
– Centrifuge/belt filter press installation
– Sludge drying bed construction
– Conveyance systems installation
– Thickener infrastructure installation
– Clarifier construction
– Pump installation
– Pump station construction
– By-passing capabilities
– Power/control panel installation
Waste to Energy Systems:
– Gas handling (thermal drying) system installation