• BELT PRESS

    BELT PRESS

  • CENTRIFUGE INSTALLATION

    CENTRIFUGE INSTALLATION

  • SBR CLARIFIER CONSTRUCTION

    SBR CLARIFIER CONSTRUCTION

  • SBR CONSTRUCTION

    SBR CONSTRUCTION

  • MEMBRANE DIGESTER COVER CONSTRUCTION

    MEMBRANE DIGESTER COVER CONSTRUCTION

  • MEMBRANE DIGESTER COVER INSTALLATION

    MEMBRANE DIGESTER COVER INSTALLATION

  • INFLUENT BUILDING AND UV TREATMENT CONSTRUCTION

    INFLUENT BUILDING AND UV TREATMENT CONSTRUCTION

  • FUSION GLASS LINED TANK INSTALLATION

    FUSION GLASS LINED TANK INSTALLATION

  • START UP OF SBRs

    START UP OF SBRs

  • SLEDGE PUMP UPGRADE

    SLEDGE PUMP UPGRADE

  • CO-GEN FACILITY/CAT GENERATORS INSTALLATION

    CO-GEN FACILITY/CAT GENERATORS INSTALLATION

  • MECHANICAL BAR SCREEN INSTALLATTION

    MECHANICAL BAR SCREEN INSTALLATTION

  • INSTALLATION OF PUMPS AND CONVEYORS

    INSTALLATION OF PUMPS AND CONVEYORS

As government regulation dictates more stringent effluent parameters for our wastewater treatment systems, and as corrosion and obsolescence demand the constant attention of plant operators, plant upgrades continue to be a focus of Blue Heron Construction.

Services include:

 Waste Water Purification Plant Construction

– Facility Construction

– Filtration system construction

– Fusion™ water storage tank installation

– Membrane/steel digester cover installation

– Wetland/biofilter construction

– Centrifuge/belt filter press installation

– Sludge drying bed construction

– Conveyance systems installation

– Thickener infrastructure installation

– Clarifier construction

– Pump installation

– Pump station construction

– By-passing capabilities

– Power/control panel installation

Waste to Energy Systems:

– Gas handling (thermal drying) system installation